SSL testing

The testing of LUL's Sub-Surface Line (SSL) 'S stock' at the Old Dalby test track falls into three main areas

Tests of the first pre-production units

Once the first production SSL sets arrived from Litchurch Lane Works the following testing was carried out. Some of this was standard acceptance type testing and some was specified by LUL. Shakedown running and fault finding also took place and any mods were incorporated into the production build.

Trials and training

Additionally at the beginning of the operation the following tests/trials were undertaken

Tests of the production trains

Now that the operation is gathering momentum the standard tests/checks are

Once the units are officially accepted they are moved to Neasden ot West Ruislip depots for service running